Lípová 15, 120 44 Praha 2 | Email: kvas@beerresearch.cz | Tel.: +420 224 900 129 | Fax: +420 224 290 618
Kvasny Prum. 1955; 1(6): 122-124 | DOI: 10.18832/kp1955030
The author of the article, as a constructer specialized in malt-house equipment, presents a comprehensive list of preventive maintenance work with a particular view of seemingly minor defects which during the campaign can be conducted only temporarily therefore they jeopardize the production process.
(In Czech, English summary only).
Published: June 1, 1955