Kvasny Prum. 1955; 1(6): 122-124 | DOI: 10.18832/kp1955030

Inter-campaign malt-house maintenance.Peer-reviewed article

M. RŮŽIČKA

The author of the article, as a constructer specialized in malt-house equipment, presents a comprehensive list of preventive maintenance work with a particular view of seemingly  minor defects which during the campaign can be conducted only temporarily  therefore they jeopardize the production process.
(In Czech, English summary only).

Keywords: NOT AVAILABLE

Published: June 1, 1955