Kvasny Prumysl, 1955 (vol. 1), issue 3
Distilleries help to secure sufficient quantity of potatoes.Peer-reviewed article
O. LAUDA
Kvasny Prum. 1955; 1(3): 50-53 | DOI: 10.18832/kp1955012
Efficient ways to secure sufficient quantity of potatoes meeting the requirements of distilleries. Existing troubles in supplying potatoes and their reasons. Vital importance of correct and up-to-date agrotechnics, thorough selection of seed and fighting the diseases. Some phytopathological issues. Various methods for planting potatoes and the advantages of square planting.(In Czech, English summary only)
Growing high-quality barley for malting plants.Peer-reviewed article
L. DOHNAL
Kvasny Prum. 1955; 1(3): 53-57 | DOI: 10.18832/kp1955013
Properties distinguishing high-quality barley varieties. Requirements of the malting industry. Properties which can be improved by careful selection and growing. Analyses of barley. Composition of grains. Contents of enzymes and nitro-combinations. Contents of extract. Eleurone cells layer. Number of root offsets.(In Czech, English summary only)
Spring jobs in hop-gardens.Peer-reviewed article
A. BRETTSCHNEIDER
Kvasny Prum. 1955; 1(3): 57-60 | DOI: 10.18832/kp1955014
Important spring work in hop-fields. Manuring of hop-fields. Harrowing, pruning and ridging. Uncovering the stems. Measures against insects and diseases. Connecting the guiding wires and binding the bines. Recommended chemicals. Thorough tillage as one of the crucial conditions of keeping the hop-fields in sound condition.(In Czech, English summary only)
Spring jobs in vineyards.Peer-reviewed article
J. BLAHA
Kvasny Prum. 1955; 1(3): 60-62 | DOI: 10.18832/kp1955015
Author describes all main spring work in vineyards. He underlines the importance of correct pruning, protecting the plants against acarinoses diseases, fertilizing with nitrogenous fertilizers and securing thus the maximum leaf surface. Concluding paragraphs are devoted to the question of preserving soil moisture, to grafting and to the selection of young plants.(In Czech, English summary only)
Planning the labor productivity in distilleries.Peer-reviewed article
R. OČENÁŠEK
Kvasny Prum. 1955; 1(3): 63-64 | DOI: 10.18832/kp1955016
New method of planning the number of employees in various plants in accordance with time rates for products. This method takes into its calculation not only the production volume, but also varying requirements for labor. Reliable estimation of labor in man/hours for main production and maintenance is thus enabled.(In Czech, English summary only)